Factors that may be relevant:
- in Downtown Austin, TX
- at a law firm’s office building
- could not get machines into this property so all the work as done by hand (shovel, rake, axe, machete, chainsaw)
- on a very steep grade
- these before photos were taken a few days into the project and do not show the 3’ of trash that sat on and in the side of the hill with the steep grade
- took two people 14 days to complete
- the area l cleaned is about ⅓ of an acre in total
- the work done was:
• cutting and removing ¼” vines from trees
• excavating an enormous amount of trash from within/on the hill and hauling it off
• creating a horizontal, walkable landing across the face of the steep grade, reinforced by a light stone retaining wall
• knocking down, cutting up and stacking dead trees in the corner of the lot
• removing a large part of the dirt on the face of the hill above the walkable landing in order to create the walkable landing
• watering the grade/landing repetitively to get the dirt to…