The impact rating decides almost everything else in a NERC CIP program: which requirements apply, how much evidence you keep and what an audit looks at. CIP-002-5.1a's bright-line criteria are short, but they are easy to misread. These are the mistakes that come up most for generation operators.
1. Rating the sites and forgetting the control room
A single solar or wind plant reaches medium impact under criterion 2.1 only at 1,500 MW or more at one plant location in one Interconnection. That threshold is rarely met, so operators conclude the whole program is low impact.
Criterion 2.11 is separate: a Control Center or backup Control Center that performs Generator Operator functions for 1,500 MW or more in a single Interconnection is medium impact. As a portfolio grows, the remote operations center can cross that line while every site stays low. Re-check it every time capacity is added.
2.β¦