Menu

Highway/Bridge - SR-71/SR-91 Interchange Project
📰

Highway/Bridge - SR-71/SR-91 Interchange Project

Reading 0:00
15s threshold

Photo courtesy Riverside County Transportation Commission

SR-71/SR-91 Interchange Project

Corona, Calif.

Award of Merit

Submitted by: Skanska USA Civil West

Owner: Riverside County Transportation Commission

Civil Engineer: Parsons

General Contractor: Skanska USA Civil West

Deep Foundations: Condon-Johnson

Construction Manager: CHA Solutions

This gateway shared by Riverside, Orange and San Bernardino counties provides a vital link for commuters and freight, so the initial plan to shut the freeway down for 55 hours during a weekend was not a popular one. In response to the city of Corona’s objections, the team reshaped its strategy to avoid closures by redrawing traffic control limits, staging work beside live lanes and breaking critical operations into repeatable overnight windows. This included setting a 15-ft-dia reinforcement cage with a 350-ton crane.

Below grade, differing site conditions turned up at four bents, and two more produced obstructions that weren’t on any drawings.…

Continue reading — create a free account

Join HashtagPLUS to read full articles, follow hashtags, vote, and join the conversation.