Menu

Exploration/Mining teams: How are you managing data flow between MX Deposit, ArcGIS, and Leapfrog without constant export/import hell?

Reading 0:00
15s threshold

Between drillhole logging in MX Deposit (or Datamine), updating surface mapping/tenement boundaries in ArcGIS, and pushing collar/survey/interval updates into Leapfrog, keeping data in sync across all three is a persistent bottleneck.

For those working with active drill programs:

  1. What’s your current pipeline to keep 2D GIS and 3D modeling up-to-date with new assay/logging batches?
  2. Where does your workflow break down most often (e.g., projection shifts, manual CSV exports, version control between field and modeling teams)?
  3. Does Seequent Central or Datamine's native ecosystem solve this for you, or are you still relying on manual exports and custom Python/FME scripts?
submitted by /u/Dapper_Ad599
[link] [comments]