Most hospital scheduling projects get judged on the roster screen. In my experience they succeed or fail on a much less visible piece: the pipe between the schedule, the time clock and payroll. If that pipe leaks, nurses get paid wrong, and nothing kills adoption faster than a short paycheck.
I have built or repaired this integration a handful of times. Here is what I would tell an engineer starting on it.
Three systems, three different truths
The scheduling system knows what was planned : who should work which shift, on which unit, in which role. The timekeeping system knows what happened : punches, meal breaks, missed punches, edits by managers. Payroll knows what is owed : base rate, differentials, overtime, premiums. Your integration exists to reconcile those three, and they disagree constantly.
A nurse scheduled 07:00 to 19:30 on 4 West punches in at 06:52, gets floated to the ED at 11:00, misses a meal break, and stays until 20:10 to finish handoff.…