Menu

1 / 2

Changing City: BKC-Dharavi travel to get quicker, girder launch set to start on Mithi River bridge

The Indian Express·Nayonika Bose·about 8 hours ago
#W1rdbcof
#indianexpress#bridge#phase#project#structure
Long article (409 words) — no AI summary yet.
Reading 0:00
15s threshold

The structure is pegged to ease congestion and offer relief for commuters. (Express photos by Akash patil)

The Mumbai civic body, the Brihanmumbai Municipal Corporation (BMC), is set to begin girder launching on the new bridge linking Bandra and Dharavi over the Mithi River. The move may improve Mithi’s flow and boost connectivity between the suburbs and South Mumbai.

The new bridge is part of the second phase of a Rs 204 crore project launched to widen the existing bridge to 10 lanes.

About the project

As part of the Mithi River basin widening project, the civic body plans to raze the existing and nearly 50-year-old bridge between Bandra and Dharavi to make way for a new, wider bridge.…

Continue reading — create a free account

Join HashtagPLUS to read full articles, follow hashtags, vote, and join the conversation.