TL;DR: Took a “stepping stone” role after a redundancy. The team is dysfunctional and under-resourced, I got publicly shut down by a group PM, and my manager hasn’t backed me up. I’m mentally checked out and interviewing elsewhere, including a final round. Should I quit without an offer, and what’s a sensible deadline?
I was made redundant in March/April with about 4.5 months’ payout. At the time, I was mid-transition from one design discipline into another.
I took 1.5 months off to move into my new place and renovate, then spent 3 months job hunting. I had 52 applications, 7 interviews, 1 offer. I made the final round for my top choice but didn’t get it, so I took the offer. Part of me knew it was a stepping stone. It’s 4 days in office. Base salary is slightly higher than my old role, but total comp is a lot lower.
I wanted to leave since week one. I stayed partly because I thought I needed the job to refinance, which turned out not to be necessary.…