Installed pressure-reducing valve. The pex will be replaced with copper when the water heater is installed. Our local code requires a shutoff between the pressure reducing valve and water meter. Made it as overkill as possible. Hose bib is for filling aquariums. Also installed the plywood as a mounting surface it will have components for the new boiler. Maybe whole house filter.
submitted by