Plumber had to cut a corner section of wall out (https://imgur.com/a/eTaj5sL) to get access to a pipe and replace a section. How do I go about re-framing this section? Specifically, how can I extend the sawed off 2x4 back to the bottom plate? Should I use some kind of half-lap joint or should I just replace the entire stud from the top plate all the way down (which would require more drywall work)?
I imagine that this happens more often than not when old pipes are replaced in a finished basement, but I couldn't find any resources online. Maybe I'm not searching for the right terms, pointers are appreciated.