The NASA STEM Team has posted a student-level explainer on nasa.gov about the Moon Base, the first lunar outpost, planned for the Moon’s South Pole region. The site was picked for its lighting: the Sun stays low on the horizon, so some areas have long stretches of sunlight good for solar power, while some crater floors are in permanent shadow and may hold frozen water ice.
Construction is planned in three phases. Phase One is happening now, with robotic landers and terrain vehicles scouting sites and testing landing techniques. Phase Two, 2029 to 2032, sets up power, cargo transport and communications hardware across several locations. Phase Three assembles the permanent outpost where astronauts live and work.
Rovers are a big part of it. VIPER is fully built and in testing at Johnson Space Center, launching in 2027 to search shadowed craters for water over more than 15 miles of driving. PROMISE, a nuclear-powered rover built from Mars mission hardware, targets late 2028.…