I’m planning to replace this shower surround with a wedi system, but I’m running into a layout issue: the existing drain is off-center.
Moving the drain isn't an option because of how the floor joists run and the wall placement directly underneath. As a result, the drain cutout ends up about 1/4 of the way from the wall rather than in the center.
For anyone experienced with wedi, how have you handled off-center drains in the past? Did you custom-cut a standard wedi pan, use a pre-sloped off-center/line drain pan, or go with a custom kit? Thanks in advance!