Shrunk my 5m launch vehicle down to 3.75 bc I was leaving too much dV on the stages when launching, and the large second stages make station docking a little tight.…
After detatching my minmus miner I found out the skycrane just flew straight up and still had like 1500m/s of delta v left. so I just flew it back to kerbin and landed it.
I had three different contracts with ferrying a total of 14 tourists to various combinations of landing/orbiting Minmus or the Mun. I found it saved mass to just strap down 16 seats in two service bays (1.4t) than to use multiple hitchhiker modules (2.07t…